Islamabad: The Capital Development Authority (CDA) has completed work on repairing, decorating, and restoration of about 50 parks in various sectors of the city.
Portable washrooms have been fitted in the parks, and tenders have been delivered for the elevating of the Landscape of Golra and Srinagar Highway. The fountains of the city will soon be restored.
The CDA`s work for restoration, repairing, and beautification of small as well as big parks of the city is still in the project. The work in the first phase of all big 50 parks includes work in parks of I-8, I-9, I-10, F-9, G-9, G-10, G-11 park, and some others too.
For work in all other parks, the tenders have been issued, and some tenders have been opened, also the work in some parks have been initiated.
The work upon walking tracks, repairing swings, green belts, cutting of dried wood and shrubs, plantation, anti-coronavirus spray, anti-dengue, and other major ingredients of the park, has been started.
اسلام آباد: کیپیٹل ڈویلپمنٹ اتھارٹی (سی ڈی اے) نے شہر کے مختلف سیکٹرز میں 50 کے قریب پارکوں کی مرمت ، سجاوٹ اور بحالی پر کام مکمل کرلیا ہے۔
پارکوں میں پورٹ ایبل واش رومز لگائے گئے ہیں ، اور گولرا اور سری نگر ہائی وے کے زمین کی تزئین کی بلندی کیلئے ٹینڈرز فراہم کردیئے گئے ہیں۔ شہر کے فوارے جلد ہی بحال کردیئے جائیں گے۔
شہر کے چھوٹے چھوٹے بڑے پارکوں کی بحالی ، مرمت اور خوبصورتی کے لئے سی ڈی اے کا کام ابھی باقی ہے۔ تمام بڑے 50 پارکوں کے پہلے مرحلے میں ہونے والے کام میں I-8، I-9، I-10، F-9، G-9، G-10، G-11 پارک اور کچھ دیگر پارکوں کے کام بھی شامل ہیں۔
دوسرے تمام پارکوں میں کام کے لئے ٹینڈر جاری کیا گیا ہے ،
، اور کچھ ٹینڈرز کھول دیئے گئے ہیں ، کچھ پارکوں میں کام بھی شروع کردیا گیا ہے۔
پیدل چلنے والی پٹریوں ، جھولوں کی مرمت ، گرین بیلٹس ، خشک لکڑی اور جھاڑیوں کی کٹائی ، باغات ، اینٹی کورون وایرس اسپرے ، اینٹی ڈینگی ، اور پارک کے دیگر اہم اجزاء پر کام شروع کیا گیا ہے۔